The ETERA factory is shifting into a new gear this week. More machines have rolled through the gates, filling the production hall with steel and structure, and the floor is beginning to look less like a construction site and more like a working factory.
At the centre of it all, the main processor — the brain of the entire operation — has finally revealed its face. With its arrival, the production line will begin to connect, align, and take shape around it as the systems lock into position.
Mid‑May is approaching, and the heart of the factory is nearly ready to beat!